Metal works painting line

Part size 800х360х710 mm
Cycle time 30 min
Performance 96 pcs per shift
Traverse load 200 kg

PROCESS CYCLE 

1. Loading
2. Degreasing-phosphatizing 60oC
3. First water rinsing  
4. Second water rinsing  
5. Moisture drying 120-130oC
6. Polymerization 180-220oC
7. Priming  20oC
8. Surface drying 60oC
9. Filler applying 20oC
10. Filler drying 60oC
11. Enamel applying (1st coat) 20oC
12. Surface drying 60oC
13. Enamel applying (2nd coat) 20oC
14. Surface drying 60oC
15. Unloading  

EQUIPMENT 

  • 4-stages surface preparation jet spray unit
  • Polimerization oven / drying oven
  • 2 paint booths
  • Filling and grinding zone
  • Manual overhead conveyor
  • Electric equipment
  • Paint mixing room
  • Powder coating booth


If you have any questions, you can contact our managers